Lockleaze Fast Frequency Response

Western Power Distribution August 2017 – March 2018

Objectives and purpose

Acting as the Independent Connections Provider (ICP) for the 15MW Lockleaze Fast Frequency Response (FFR) facility in Bristol, Smith Brothers was enlisted by contractor Metka-EGN to carry out the high voltage electrical connections and substation construction on the UK’s largest standalone battery storage site.

img_0324 img_0153 img_0005
NERSFpal AchillesUVDBISO 9001ISO 14001ISO 18001