Successful solar farm connection

Binstead Solar Farm January – March 2016

Objectives and purpose

Smith Brothers Contracting was appointed to complete all contestable works for the 7 MVA Photovoltaics (PV) generation project. The scope of works included a 33kv tee-off connection into the existing Scottish & Southern Energy (SSE) Shripney – Bilsham overhead line circuit.

3 2 x 4
RoSPANERSFpal AchillesUVDBISO 9001ISO 14001ISO 18001